Crane Equipment

Crane Equipment

Bucket: It is used for the purpose of carrying any kind of poured load.
 
Polyp Bucket: It is used for the purpose of carrying mineral loads such as coal, stone or for the purpose of carrying scrap loads or for the purpose of deep screening.
 
Magnet: It is used for the carrying of metal products at steel processing industry. 
 
C-Hook: It is used to prevent undesirable conditions such as overlapping, scattering, sliding or rolling over while carrying the load.
 
Load Traverse: It is used to carry the load as balanced.
 
Load Gripping Apparatus: It is used to carry the load as balanced by gripping the load from the edges.
 
Operator Cabin: This is a command system assisting accurate carrying of the load through operator panel and joystick system used for the purpose of easy vision of work site where the existence of crane operator at work site may not be beneficial. In operator cabins used for heavy duty industry such as Iron-Steel, shipyard, harbour sector, it is enabled for operator to work in health conditions with industrial type air conditioning system. 
 
Electrical Room: These are prefabricated structures, in which all electrical systems that are used at process cranes exist.
 
Industrial Type Air Conditioner: Operation of electrical materials are enabled to be performed without being affected by high temperature through industrial type air conditioning system to be used at electrical rooms or operator cabins that are available on the cranes and used at heavy duty industry such as iron-steel sector.
 
Bogie Groups: Solution is found with bogie systems for travelling groups at high tonnage cranes and bridge cranes having long bridge shaft distance.